Solar Trade Platform and Directory of Solar Companies
Chizhou Anan Aluminum Co., Ltd.

Chizhou Anan Aluminum Co., Ltd.

An'an Industrial Park, Jiangnan Industrial Concentration Area, Chizhou, Anhui
Click to show company phone
China China

Staff Information

No. Staff
1,000
Useful Contacts
Contact Face
Ada Sales Manager
Contact Face
Jessica Sales Manager

Assessed Supplier

Factory Inspection By TÜV Rheinland

Confident in the quality of their equipment and processes — Chizhou Anan Aluminum Co., Ltd. has opened their doors to an independent third party inspection service provider.


The data provided here has been collected by the industry's most established solar testing bureau — TÜV Rheinland

Company Name :

Chizhou Anan Aluminum Co., Ltd.

Facility Address :

Northwest of the Intersection of Yingbin Avenue and Xianyushan Road, An'an Industrial Park, Jiangnan Industrial Concentration Zone, Chizhou City, Anhui Province, China

Contact Person :

Mr. Ryan Liu

Fax :

N/A

URL/Web Address :

www.ananaluminum.com

Report Date :

2022-08-29

Expiry Date (24 months validity) :

2024-08-28

Name Of Assessor :

Acaile Xu

Overall Turnover Of Last Year :

USD 185,669,799

Total Building Size :

94,116 m2

Number Of Buildings :

5

Office Size :

3,000 m2

Working Day :

Monday-Saturday

Working Hours :

08:00-17:00

Department Name

Full Time Employee(s)

Part-Time Employee(s)

Total

President

1

0

1

GM

1

0

1

Production Dept.

319

0

319

Technology Dept.

18

0

18

Quality Dept.

18

0

18

Financial Dept.

7

0

7

Sales Dept.

7

0

7

Purchasing Dept.

7

0

7

Equipment Dept.

12

0

12

total

390

0

390

Export Business Capacity

Current Export Situation

there is foreign trading employee in the company

Work Experience

Headcount

Over 30 Years

0

21-30 Years

0

11-20 Years

0

6-10 Years

0

2-5 Years

1

Less than 2 years

0

Accepted Language

Listening & Speaking

Reading & Writing

English

Does the company have a valid export license? :

  Yes, Export License Registration No.: 04454466

Trade Agents Employed Overseas? :

 No

Average lead time from product order confirmation to production delivery (products exiting the company) :

15 Days

Nearest Port :

Shanghai Port, Ningbo Port

Accepted Payment Terms

 FOB
 CIF
 EXW
 CFR

Accepted Payment Types

 T/T

Market Distribution (Previous 12 Months)

Market

Main Product(s)

Total Revenue(%)

Southeast Asia

Frame

1 %

Domestic Market

Frame

99 %

Product Name

Production Line Capacity

Actual Units Produced (Previous Year)

Frame

5,260,000 Piece/Month

49,820,000 Piece

Production Machinery

Key Machine Name

Brand & Model No.

Quantity

Condition

Extrusion Molding Production Line

Jingtai 3000T/1100T/1000T/700T

15

Acceptable

Aging Furnace

Qichengda YLK-18K/27K

6

Acceptable

Sanding Machine

Huamingde HMD 4*4-8

6

Acceptable

Oxidation Production Line

Chuangwei

2

Acceptable

Automatic Photovoltaic Frame Production Line

Shengxin FT-9-1

18

Acceptable

CNC Machining Center

PRATIC PYB-CNC2500

48

Acceptable

Extrusion Molding Production Line

Aging Furnace

Sanding Machine

Oxidation Production Line

Automatic Photovoltaic Frame Produc...

CNC Machining Center

Key Testing Machinery

Machine Name

Brand & Model No.

Quantity

Condition

Coordinate Measuring Machine

CROMA 10308

1

Acceptable

Spectrometer

METEK

1

Acceptable

Universal Testing Machine

Qiantong QT-6060D

2

Acceptable

Image Measuring Instrument

KSY MV5030-CNC

2

Acceptable

Hardness Tester

Laishi HBRVS-187.5

1

Acceptable

Metallographic Tester

Wance MTF-2000

1

Acceptable

Coordinate Measuring Machine

Spectrometer

Universal Testing Machine

Image Measuring Instrument

Hardness Tester

Metallographic Tester

Production Flow

Aluminum Profile Extrusion Molding

Aluminum Profile Aging

Aluminum Profile Sanding

Surface Oxidation of Aluminum Profi...

Frame Forming

Final Products

R & D Capacity

Current Situation

There are 18 R&D engineers in the company.

Education Level

Headcount

Doctorate

0

Post-Graduate

0

Graduate

8

Junior College

10

Technical School

0

High School

0

Brand Situation

Registration/application No.

Brand Name

For Approval to Use Goods

Validity Date

Ref.

35229734

Refer to the Photo

Class 7

2020-01-07~
2030-01-06

Photo in Certification & Photos

35957301

Refer to the Photo

Class 6

2019-12-28~
2029-12-27

Photo in Certification & Photos

35939768

Refer to the Photo

Class 6

2019-12-28~
2029-12-27

Photo in Certification & Photos

Patent Situation

Patent No.

The Name of the Patent

The Patent Type

Available Date

Ref.

ZL 2020 1 0627530.4

A splicing aluminum alloy frame for balcony with fixed self-locking mechanism

Invention patent

2022-02-25

Photo in Certification & Photos

ZL 2020 1 0726291.8

An L-shaped edge banding aluminum profile

Invention patent

2022-02-18

Photo in Certification & Photos

ZL 2018 1 0653443.9

Aluminum alloy based composite wire and its manufacturing method

Invention patent

2020-08-14

Photo in Certification & Photos

ZL 2021 2 0759903.3

A new type of room temperature stress cycling strengthening equipment for aluminum alloy

The patent for utility model

2021-11-12

Photo in Certification & Photos

Does the company provide OEM/ODM service for others?

 Yes

Are there relevant design input/output, review, and verification documents available for the assessed company?

 Yes

Based on inspection, are R&D employees equipped with adequate specialized equipment?

 Yes

Do R&D employees use any specific software for designing new products?

 Yes

Development Devices

Coordinate Measuring Machine

Spectrometer

Universal Testing Machine

MANAGEMENT SYSTEMS & QUALITY CONTROL MANAGEMENT

Certification

Certified By

Certificate No.

Business Scope

Expiry Date

IATF16949:2016

NSF International Strategic Registrations

CNIATF044474

Production of Aluminum Profile

2020-12-23~2023-12-22

ISO14001:2015

Hangzhou WIT Assessment Co., Ltd.

15/21E1688R00

Environmental Management in Aluminum Profile Manufacturing

2021-12-13~2024-12-12

ISO45001:2018

Hangzhou WIT Assessment Co., Ltd.

15/21S1689R00

Occupational Health and Safety Management in Aluminum Profile Manufacturing

2021-12-13~2024-12-12

After Sales Service

Are there any clear procedures for handling customer complaints?

  Yes, with clear procedures and written records

Has the company set up any procedure for customer feedback, including complaints, clearly recorded and maintained?

  Yes, with a standard feedback form and records

Does the company have the SOP (Standard Operation Procedure) for after-sales service? Does the company provide after-sales consulting services?

 Yes

Does the company implement the provisions of the National Three Warrantees (warrantee for repair/replacement /return) for their products?

 Yes

Quality Control Management

Does the company set up any inspection standards for raw materials?

 Yes

Has the company set up necessary quality inspection standards in the process of production?

 Yes

Does the company have any measures to control the management of unqualified materials after sampling, to avoid mixing up or wasting?

 Yes

Are work instructions available at the location where the processes take place?

  Total Line

Is personal protective equipment (PPE) needed in the production line?

 Yes

Is the management and usage of production materials as well as the production process executed by staff who are appropriately trained and qualified or by senior staff?

 Yes

Supplier Management

Does the company have a supplier assessment procedure?

 Yes

Does the company establish and implement a standard procedure for purchasing contract review and approval?

  Yes, with written standard procedures

Does the company keep its supplier assessment reports?

  Yes, Keep for 2 years available

Are the company’s purchasing documents sufficient to ensure product safety control and their customers’ requirements?

  Yes, the purchasing document includes all the information required

Is there a procedure to conduct random product inspections after final packaging?

  Yes, with clear standard and written inspection records

Certification & Photos

Certificate Photo -- Business Licen...

Certificate Photo -- Permit for Ope...

Certificate Photo -- Customs Clear...

Certificate Photo -- Import and Ex...

Certificate Photo -- Trademark 1

Certificate Photo -- Trademark 2

Certificate Photo -- Trademark 3

Certificate Photo -- IATF16949:2016

Certificate Photo – ISO14001:2015

Certificate Photo – ISO45001:2015

Certificate Photo -- Patent 1

Certificate Photo -- Patent 2

Certificate Photo -- Patent 3

Certificate Photo -- Patent 4

Company Gate

Office Building

Workshop

Workshop

Warehouse

Warehouse

Product Photo

Product Photo

Product Photo

Product Photo

Development/Expansion Plans

Company Development Action

Timeframe

The company is going to be a public company.

2 Years

Health and Safety

Has the company set up a safety responsibility system, and distributed to all levels of supervisor and provided them with corresponding training?

 Yes

Does the company conduct regular inspection of the plant and equipment, to ensure the health and safety of the workshop at least in accordance with the law?

 Yes

Does the company regularly provide necessary safety and health training, to make the staff understand that there might be occupational hazards in their work, and take appropriate protective measures when necessary? (For example, how to use personal protective equipment safely, etc.)

 Yes

Does the company hold regular fire drills, including fire drills and evacuation drills? Do the staff clearly know how to raise an alarm, how to evacuate and how to use the fire extinguisher?

 No

Does the company have the approval report issued by the local Fire Bureau?

 Yes

Does the company provide sufficient first aid equipment? Are first-aid kits and trained first-aiders available in each workplace?

 No

Does the company provide clean lavatory, separating men’s and ladies?

 Yes

Does the company provide clean drinking water to the staff? Is there unrestricted access to the drinking water?

 Yes

Corporate social responsibility

Is it clarified that there’s no child labor in the company?

 Yes

Does the company have an explicit job management program, and take corresponding measures to check the age of the employees?

 Yes

Are the staff clearly aware of the terms of labour contract, regulations of the company and the right of free employment?

 Yes

Have the staff been forced to work overtime? Will they be fined or fired if they refuse to?

 No

Business Details

Material Types
Frame
Last Update
8 Aug 2023