Qinhuangdao Zenithsolar Technological Co., Ltd.

Qinhuangdao Zenithsolar Technological Co., Ltd.

Yazishan Industrial Park, North Industrial Zone, Haigang District, Qinhuangdao, Hebei
+86 335 8382258
China China.png

Staff Information

No. Staff
120

Business Details

Equipment Types
Wafer Sorter
Panel Turn-Key Production Line, Panel Solar Simulator, Soldering Equipment, Laminator, Cell Laser Scriber/Cutter, Framing Machine, Ribbon Cutter, Conveyers, Lay-up Station

Assessed Supplier

Factory Inspection By TÜV Rheinland

Confident in the quality of their equipment and processes — Qinhuangdao Zenithsolar Technological Co., Ltd. has opened their doors to an independent third party inspection service provider.


The data provided here has been collected by the industry's most established solar testing bureau — TÜV Rheinland

Company Name :

Qinhuangdao Zenithsolar Technological Co., Ltd.

Facility Address :

(The Industrial Park of Yazishan) Yazishan Village, Beigang Town, Haigang District, Qinhuangdao City, Hebei Province, China

Contact Person :

Mr. Chengwei Wang

Tel :

13603359003

Fax :

0335-8381295

URL/Web Address :

http://www.zenithsolar.net http://www.solarhope.cn

Report Date :

2018-03-17

Expiry Date (24 months validity) :

2020-03-16

Name Of Assessor :

Mr. Xiaoqiang Li

Overall Turnover Of Last Year :

RMB 16,000,000

Total Building Size :

8,000 m2

Number Of Buildings :

3

Office Size :

800 m2

Working Day :

Monday-Sunday

Working Hours :

08:00-17:00

Department Name

Full Time Employee(s)

Part-Time Employee(s)

Total

GM

1

0

1

Finance Dept.

3

0

3

Purchase Dept.

1

0

1

Production Dept.

9

0

9

Tech. Dept.

3

0

3

International Trade Dept.

3

0

3

Sales Dept.

1

0

1

total

21

0

21

Export Business Capacity

Current Export Situation

There are 3 foreign trading employees in the company.

Work Experience

Headcount

Over 30 Years

0

21-30 Years

0

11-20 Years

1

6-10 Years

0

2-5 Years

1

Less than 2 years

1

Accepted Language

Listening & Speaking

Reading & Writing

English

Does the company have a valid export license? :

  Yes, Export License Registration No.: 02159612

Trade Agents Employed Overseas? :

 No

Average lead time from product order confirmation to production delivery (products exiting the company) :

30 -- 40 Days

Nearest Port :

Tianjin

Accepted Payment Terms

 FOB
 CIF
 EXW
 CFR

Accepted Payment Types

 L/C
 T/T
 Cash

Market Distribution (Previous 12 Months)

Market

Main Product(s)

Total Revenue(%)

North America

1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine

5 %

Eastern Europe

1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine

8 %

Southeast Asia

1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine

5 %

Africa

1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine

10 %

Oceania

1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine

3 %

Middle East

1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine

30 %

Eastern Asia

1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine

5 %

Western Europe

1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine

3 %

Central America

1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine

1 %

South Asia

1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine

20 %

Domestic Market

1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine

10 %

Product Name

Production Line Capacity

Actual Units Produced (Previous Year)

1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine

10 Sets/Month

100 Sets

Production Machinery

Key Machine Name

Brand & Model No.

Quantity

Condition

Drilling Machine (1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine)

Z3050*14

2

Acceptable

Welding Machine (1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine)

WS-400

9

Acceptable

Bending Machine (1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine)

WC67Y-100/2500

1

Acceptable

Shearing Machine (1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine)

QC12K-8*2500

1

Acceptable

Milling Machine (1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine)

XZ6350A

1

Acceptable

Drilling Machine (1-30 MW Semiautom...

Welding Machine (1-30 MW Semiautoma...

Bending Machine (1-30 MW Semiautoma...

Shearing Machine (1-30 MW Semiautom...

Milling Machine (1-30 MW Semiautoma...

Key Testing Machinery

Machine Name

Brand & Model No.

Quantity

Condition

Temperature Controller (1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine)

No Information

1

Acceptable

Laser Level Meter (1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine)

GLL3X

2

Acceptable

Digital Thermometer (1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All

DM6802B

1

Acceptable

Clamp Multimeter (1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine)

UT201

1

Acceptable

Multimeter (1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine)

MAS830L

1

Acceptable

Ohm Meter (1-30 MW Semiautomatic PV Line and 10-200 MW Full Automatic PV Line All Machine)

ZC25-4A

1

Acceptable

Temperature Controller (1-30 MW Sem...

Laser Level Meter (1-30 MW Semiauto...

Digital Thermometer (1-30 MW Semiau...

Clamp Multimeter (1-30 MW Semiautom...

Multimeter (1-30 MW Semiautomatic P...

Ohm Meter (1-30 MW Semiautomatic PV...

Production Flow

Shearing (1-30 MW Semiautomatic PV ...

Bending (1-30 MW Semiautomatic PV L...

Drilling (1-30 MW Semiautomatic PV ...

Welding (1-30 MW Semiautomatic PV L...

Milling (1-30 MW Semiautomatic PV L...

Assembling (1-30 MW Semiautomatic P...

R & D Capacity

Current Situation

There are 3 R&D engineers in the company.

Education Level

Headcount

Doctorate

0

Post-Graduate

1

Graduate

2

Junior College

0

Technical School

0

High School

0

Brand Situation

Registration/application No.

Brand Name

For Approval to Use Goods

Validity Date

Ref.

19628220

ZENITH SOLAR

Wind Power Equipment, Electronic Industrial Equipment, Optical Cold Processing Equipment,etc.

2017-05-28~
2027-05-27

Photo in Certification & Photos (Trademark Photos)

Patent Situation

Patent No.

The Name of the Patent

The Patent Type

Available Date

Ref.

ZL 2015 1 0430263.0

Vacuum Laminating Machine

Invention Patent

2017-05-17

Photo in Certification & Photos (Patent Photos)

ZL 2015 2 0529475.X

Vacuum Laminating Machine

The Patent for Utility Model

2015-12-09

Photo in Certification & Photos (Patent Photos)

Does the company provide OEM/ODM service for others?

 Yes

Are there relevant design input/output, review, and verification documents available for the assessed company?

 Yes

Based on inspection, are R&D employees equipped with adequate specialized equipment?

 No

Do R&D employees use any specific software for designing new products?

 Yes

MANAGEMENT SYSTEMS & QUALITY CONTROL MANAGEMENT

Certification

Certified By

Certificate No.

Business Scope

Expiry Date

ISO 9001:2015

GIC, JAS-ANZ

J16Q2YJ8001533R0S

Sales and Service of Solar Equipment and Accessories

2018-01-10~2019-01-27

Product Certification

Certification

Certified By

Certificate No.

Product Name & Model No.

Expiry Date

CE

OUTAO

OT/2016/0401/CE

PV Ribbon Cutting Machine & ZST-RCM-5, ZST-RCM-8, ZST-RCM-10

2016-04-05 ~ 2021-04-04

CE

UDEM

M.2016.201.Y1223

Glass Washer & Drying Machine

2016-05-17 ~ 2049-12-31

CE

UDEM

M.2016.201.Y1189

Auto Layup Machine & DBL-S1, DBL-S2, DBL-H1, DB-H2

2016-05-12 ~ 2049-12-31

CE

ECM

3A 160331.QZT0O99

Sun Simulator and Tester & SMT-A, SMT-B, SMT-F, SCT-A, SCT-B

2016-03-31 ~ 2021-03-30

CE

UDEM

M.2016.201.Y1179

Automatic Solar Panel Framing Machine & ZST-ZKJ-01, ZST-ZKJ-02, ZST-ZKJ-03, ZST-ZKJ-04

2016-05-10 ~ 2049-12-31

CE

UDEM

M.2016.201.Y1232

Solar Module EL Detector & ZST-EL-1600, ZST-EL-1800, ZST-EL-2000, ZST-EL-2400

2016-05-17 ~ 2049-12-31

CE

QVC

GB/1067/5856/16

Intelligent Integration Solar Module Laminator & ZST-AYB-X-Y (X05-25; Y:05-45), etc.

2016-05-10 ~ 2021-12-31

After Sales Service

Are there any clear procedures for handling customer complaints?

  Yes, with written records but no clear procedures

Has the company set up any procedure for customer feedback, including complaints, clearly recorded and maintained?

  Yes, with records but no standard feedback form

Does the company have the SOP (Standard Operation Procedure) for after-sales service? Does the company provide after-sales consulting services?

 Yes

Does the company implement the provisions of the National Three Warrantees (warrantee for repair/replacement /return) for their products?

 Yes

Quality Control Management

Does the company set up any inspection standards for raw materials?

 Yes

Has the company set up necessary quality inspection standards in the process of production?

 Yes

Does the company have any measures to control the management of unqualified materials after sampling, to avoid mixing up or wasting?

 Yes

Are work instructions available at the location where the processes take place?

  Parts of the line

Is personal protective equipment (PPE) needed in the production line?

 Yes

Is the management and usage of production materials as well as the production process executed by staff who are appropriately trained and qualified or by senior staff?

 Yes

Supplier Management

Does the company have a supplier assessment procedure?

 Yes

Does the company establish and implement a standard procedure for purchasing contract review and approval?

  Yes, with written standard procedures

Does the company keep its supplier assessment reports?

  Yes, Keep for 2 years available

Are the company’s purchasing documents sufficient to ensure product safety control and their customers’ requirements?

  Yes, the purchasing document includes all the information required

Is there a procedure to conduct random product inspections after final packaging?

  Yes, with clear standard and written inspection records

Certification & Photos

Business License

Tax Registration Certificate

Permit for Opening Bank Account

Organization Code Certificate

Import and Export Enterprise Regist...

Custom Clearance Registration Form

Trademark

Patent 1

Patent 2

ISO 9001:2015

Copyright Certificate of Computer S...

CE 1

CE 2

CE 3

CE 4

CE 5

CE 6

CE 7

Company Gate

Office

Workshop

Workshop

Product Photo

Product Photo

Development/Expansion Plans

Company Development Action

Timeframe

The organization is going to develop the new overseas market.

12 Months

Health and Safety

Has the company set up a safety responsibility system, and distributed to all levels of supervisor and provided them with corresponding training?

 Yes

Does the company conduct regular inspection of the plant and equipment, to ensure the health and safety of the workshop at least in accordance with the law?

 Yes

Does the company regularly provide necessary safety and health training, to make the staff understand that there might be occupational hazards in their work, and take appropriate protective measures when necessary? (For example, how to use personal protective equipment safely, etc.)

 Yes

Does the company hold regular fire drills, including fire drills and evacuation drills? Do the staff clearly know how to raise an alarm, how to evacuate and how to use the fire extinguisher?

 Yes

Does the company have the approval report issued by the local Fire Bureau?

 No

Does the company provide sufficient first aid equipment? Are first-aid kits and trained first-aiders available in each workplace?

 Yes

Does the company provide clean lavatory, separating men’s and ladies?

 Yes

Does the company provide clean drinking water to the staff? Is there unrestricted access to the drinking water?

 Yes

Corporate social responsibility

Is it clarified that there’s no child labor in the company?

 Yes

Does the company have an explicit job management program, and take corresponding measures to check the age of the employees?

 Yes

Are the staff clearly aware of the terms of labour contract, regulations of the company and the right of free employment?

 Yes

Have the staff been forced to work overtime? Will they be fined or fired if they refuse to?

 No

Company Description (Advertising)

QINHUANGDAO ZENITHSOLAR TECHNOLOGICAL CO.,LTD. is specialized in the production of laminator machine business, while providing the entire production line equipment and technical services. Company's products in strict accordance with ISO9001 quality control system standard.The company's new third-generation energy-saving CNC integration lamination Power low,It is saving more than 30% compared with other manufacturers products, automatic laminating the maximum power is only 48KW, Built-in imported vacuum pump from Germany,productivity high,covers an area of small, low noise , on-site installation easy, It is PV manufacturer of the ideal packaging equipment.

Integrated Design Laminator have been protected by national patent protection, The laminators have all passed CE certification, products have been exported to Germany, Italy, Japan, Canada, Ghana, Taiwan, Korea, India, Australia, Indonesia, Singapore, Myanmar, Slovenia , Turkey, Poland, Uzbekistan ,Bengal ,Croatia ,Pakistan ,Morocco and many other countries and regions, product features performance has been recognized by customers.

Products (Advertising)

Laminator:


Features:

Unique structure: the first domestic heating systems, vacuum systems and mainframe integration design, hydraulic straight from the switch cover, the rapid installation of equipment, space small, with imports of vacuum pumps, the noise below 65 dB;

Energy efficient: the equipment around maximum power of 48 KW, just normal work of 15 KW, and lower power consumption compared to peer products more than 30%; Circuit unique design and heating system PID smart regulation, System requires 60 to 90 minutes warm-up to meet the crystalline silicon, amorphous silicon EVA / PVB film package;

Intelligent control: high-performance PLC, CNC high-precision motor control components pyramid Control, speed, direction, arbitrary; transmit unlimited use of all the work cycle, and life expectancy compared to Reciprocating times increase;

Uniform temperature: the production of special heating, effective pyramid area temperature uniformity of ± 2 ℃; surface roughness ± 0.2mm, meet the ultra-thin silicon packaging requirements; control and use of multi-level multi-point measurement techniques;

System stabilization: imports of low-voltage electrical equipment, high-performance vacuum butterfly valve control, anti-dust vacuum system designed to ensure stable operation of equipment;

Multi-level protection: with over-temperature alarm system, pyramid vacuum leak alarm, open cover negative pressure alarm, oil level and other monitoring processes.


Technical parameters:

Transmission system: the feeder, host, a feeder conveyor infinite cycle of work, speed: 0 ~ 300 mm / s arbitrary adjustment

Supply voltage: AC380V/3 phase/4 Line, the largest power 48 KW, the normal work of 15 KW

Vacuum rate: 200 M3 / H, the limit vacuum 70 ~ 90 Pa, vacuum Time: 90 seconds

Scope application: Effective pyramid of 3.6m * 2.2m, 180W- 230 W battery components at the same time four or three pyramid,Capacity 8.832MWP

Rubber sheet size: 4 ~ 5 mm * 3.8m * 2.4m, the replacement time: 20 to 30 minutes

Medium heat: SD320 high-temperature heat-conducting oil 180 L, flow pressure:<0.3 MPa, Heating rate: 135 ℃ at room temperature to 60 to 90 minutes

Open cover: Straight from the hydraulic, the biggest opening height: 200 mm

Laminated cavity high: 25mm

Equipment weight: 15.8T

Equipment weight: 14m * 2.85m * 1.42m


PV Module Production Lines:




According to the customer's production requirements, can provide automatic, semi-automatic production line design and all equipment, including:

1. Tabber & Stringers;Manual Welding Table, Welding Heat Templates

2. Auto Lay Out; Manually Laying Laminated Units, Qualitative Measurement Of Laminated Film Before The Battery Short Circuit, Open Circuit

3. Automatic Laminators ;Semi-Automatic Laminating Machine (With Load/Unload System)

4. Eva/Tpt Film Cutting Machines ; Manual Eva \ Tpt Cutting Table

5. Ribbon Cutting Machines

6. Auto Frame Assembly Machines; Semi-Automatic Frame Assembly Machine

7. El Cell Camera System Cracked Pollution

8. Sun Simulators (Aaa Class)

9. Stations For High Voltage Test Module

10. Glass And Module Carriers ; Lightening Tables For Visual Inspection

11. Glass Washing Machine

12. Stations For Module Cooling

Last Update
28 Feb 2018