Storage System Technology: | LFP (LiFePO4) |
---|---|
Nominal Capacity: | 100 Ah |
Region: | China |
High-efficiency N-Type, TOPCon cells.
Multiple grid and half-cut technologies.
High peak efficiency of 22.46%.
High mechanical strength.
Suitable for harsh environments.
Established in 2008, Einnova Solarline is a leading manufacturer of solar panels and energy storage products in China and has marked its global presence in over 50 countries. Recognized consistently among China's Top 20 Solar Module Manufacturers, our growth stems from unparalleled manufacturing expertise, a dynamic production and technical team, and deep-rooted strategic partnerships. With a production capacity of 2GW across four facilities, we've achieved an installation benchmark of over 9 Gigawatts of solar modules internationally. Our commitment to excellence is unwavering, demonstrated by our adherence to IEC 61215 and 61730 quality standards and several noteworthy certifications such as TUV, CE, and INMETRO. Using premium raw materials, advanced automation, and cloud-manufacturing systems enables us to keep full tracking records of each solar module, ensuring unmatched quality control. We confidently offer a 30-year performance warranty on our products. We look forward to cooperating with you for cost-effective, high-quality solar solutions.
Great company to work with, would always recommend them. Great service representatives that are quick to resolve any possible queries.
-- Adriaan van der Walt, ARTsolar (Pty) Ltd
Company Name :
Einnova Solarline Energy Corp. Limited
Facility Address :
Contact Person :
Ms. HongYa Wu
URL/Web Address :
https://www.einnova-solarline.com
Report Date :
2024-09-13
Expiry Date (24 months validity) :
2026-09-12
Name Of Assessor :
Leaf Jiang
Overall Turnover Of Last Year :
Confidential
Total Building Size :
11,680 m2
Number Of Buildings :
1
Office Size :
591 m2
Working Day :
Monday-Saturday
Working Hours :
08:00-12:00 13:30-17:30
LEGAL ENTITY Business License Number : 91320105062625970K Year Established : 2013-03-22 Validity Period : 2013-03-22 — 2033-03-21 Registered Address : Room 710-62, No. 116 Suo Street, Jianye District, Nanjing City, Jiangsu Province, China Company Address : Building No.4, Qingxi Industrial Park, Qingxi Town, Hanshan County, Ma'anshan City, Anhui Province, China (the audited address belongs to associated company Einnova Solarline Energy Corp. Limited (Anhui)) |
Registered Capital : ¥ 10,000,000 Corporate Representative : Ms. Jinmei Tong Industry : Solar Energy Products Products/Service : Solar Panel Business Type :
Combined
Type Of Ownership :
Private Owner
|
Department Name |
Full Time Employee(s) |
Part-Time Employee(s) |
Total |
---|---|---|---|
GM |
1 |
0 |
1 |
Finance Dept. |
1 |
0 |
1 |
Admin. Dept. |
2 |
0 |
2 |
Sales Dept. |
7 |
0 |
7 |
Facilities Dept. |
1 |
0 |
1 |
Production Dept. |
47 |
0 |
47 |
QC Dept. |
9 |
0 |
9 |
total |
68 |
0 |
68 |
Export Business Capacity
Current Export Situation
There are 7 foreign trading employees in the company.
Work Experience |
Headcount |
---|---|
Over 30 Years |
0 |
21-30 Years |
0 |
11-20 Years |
2 |
6-10 Years |
3 |
2-5 Years |
1 |
Less than 2 years |
1 |
Accepted Language |
Listening & Speaking |
Reading & Writing |
---|---|---|
English |
|
|
Does the company have a valid export license? :
Yes, Export License Registration No.: 02753562Trade Agents Employed Overseas? :
NoAverage lead time from product order confirmation to production delivery (products exiting the company) :
7 -- 15 DaysNearest Port :
Shanghai Port
Accepted Payment Terms
Accepted Payment Types
Market Distribution (Previous 12 Months)
Market |
Main Product(s) |
Total Revenue(%) |
---|---|---|
South America |
Solar Panel |
8 % |
Eastern Europe |
Solar Panel |
61.37 % |
Africa |
Solar Panel |
13.54 % |
Middle East |
Solar Panel |
4.3 % |
Eastern Asia |
Solar Panel |
12.79 % |
Product Name |
Production Line Capacity |
Actual Units Produced (Previous Year) |
Solar Panel |
68 MWp/Month |
800 MWp |
Production Machinery
Key Machine Name |
Brand & Model No. |
Quantity |
Condition |
---|---|---|---|
PV Cell Laser Cutting Machine |
GPV-HP-WS08 |
3 |
Acceptable |
Series Welding Machine |
MS40A |
6 |
Acceptable |
Auto Laying Machine |
SCBLSL-01 |
4 |
Acceptable |
Slitting Machine |
SC811-2-C01 |
4 |
Acceptable |
Fold Welding Machine |
DH180-HL |
1 |
Acceptable |
Automatic Tape Sticking Machine |
SC811-2-C36 |
1 |
Acceptable |
Double Glass Laminating Machine |
SC811-2-C28 |
2 |
Acceptable |
Automatic Edge Banding Machine |
XB19039-05 |
1 |
Acceptable |
Laminating Machine |
BSL24560AC-HB |
4 |
Acceptable |
Flip Check Machine |
No Information |
1 |
Acceptable |
Frame Assembling Machine |
SC811-2-C11 |
1 |
Acceptable |
Auto Welding Machine |
CG19069-03 |
1 |
Acceptable |
Glue Filling Machine |
SPZ-AB10 |
2 |
Acceptable |
Solidification Line |
No Information |
1 |
Acceptable |
Key Testing Machinery
Machine Name |
Brand & Model No. |
Quantity |
Condition |
---|---|---|---|
Hi-pot Tester |
SC811-2-C2302 |
2 |
Acceptable |
EL Testing Machine |
KP-X-M |
4 |
Acceptable |
IV Testing Machine |
GIV-20ATS |
2 |
Acceptable |
Current Situation
There is 1 R&D engineer in the company.
Education Level |
Headcount |
---|---|
Doctorate |
0 |
Post-Graduate |
1 |
Graduate |
0 |
Junior College |
0 |
Technical School |
0 |
High School |
0 |
Does the company provide OEM/ODM service for others?
YesAre there relevant design input/output, review, and verification documents available for the assessed company?
NoBased on inspection, are R&D employees equipped with adequate specialized equipment?
NoDo R&D employees use any specific software for designing new products?
NoMANAGEMENT SYSTEMS & QUALITY CONTROL MANAGEMENT
Certification |
Certified By |
Certificate No. |
Business Scope |
Expiry Date |
---|---|---|---|---|
ISO9001:2015 |
ACM |
24CN34510449Q |
Production and Sales of Solar Photovoltaic Modules |
2024-07-13~2027-07-12 |
Product Certification
Certification |
Certified By |
Certificate No. |
Product Name & Model No. |
Expiry Date |
---|---|---|---|---|
MCS Certificate |
TUV SUD |
BABT 8882 RO |
Production of Photovoltaic Solar Panels ESM-xxxS; ESM-xxxT |
2022-01-20 ~ 2026-11-13 |
CE |
TUV SUD |
N8A 108801 0005 Rev. 00 |
Crystalline Silicon Terrestrial Photovoltaic (PV) Modules Mono-Crystalline Silicon Photovoltaic ModuleESM-xxxH, xxx= 670 to 710 in steps of 5 ESM-xxxH, xxx610 to 645 in steps of 5; ESM-xxxH, xxx= 670 to 710 in steps of 5; ESM-xxxH, xxx610 to 645 in steps |
2024-06-04 ~ 2029-06-03 |
CE |
ZTL |
ZTL-2020122201C |
SOLAR MODULE; ESM310; ESM XXX, ESP XXX, ESM XXXH, ESP XXXH, ESM XXX-BDG, ESP XXX-BDG, ESM XXX-BDGH, ESP XXX-BDGH, ESM-XXXS, ESP-XXXS,X ESM XXXBIPV, ESP XXXBIPV, ESM XXXSB, ESM XXXTB, ESP XXXTB (XXX STAND FOR 1W-700W) |
2020-12-25 ~ 2025-12-24 |
After Sales Service
Are there any clear procedures for handling customer complaints?
Yes, with clear procedures and written recordsHas the company set up any procedure for customer feedback, including complaints, clearly recorded and maintained?
Yes, with a standard feedback form and recordsDoes the company have the SOP (Standard Operation Procedure) for after-sales service? Does the company provide after-sales consulting services?
YesDoes the company implement the provisions of the National Three Warrantees (warrantee for repair/replacement /return) for their products?
YesQuality Control Management
Does the company set up any inspection standards for raw materials?
YesHas the company set up necessary quality inspection standards in the process of production?
YesDoes the company have any measures to control the management of unqualified materials after sampling, to avoid mixing up or wasting?
YesAre work instructions available at the location where the processes take place?
Total LineIs personal protective equipment (PPE) needed in the production line?
YesIs the management and usage of production materials as well as the production process executed by staff who are appropriately trained and qualified or by senior staff?
YesSupplier Management
Does the company have a supplier assessment procedure?
YesDoes the company keep its supplier assessment reports?
Yes, Keep for 1 years availableAre the company’s purchasing documents sufficient to ensure product safety control and their customers’ requirements?
Yes, the purchasing document includes all the information requiredIs there a procedure to conduct random product inspections after final packaging?
Yes, with clear standard and written inspection recordsCertification & Photos
Development/Expansion Plans
Company Development Action |
Timeframe |
---|---|
It is estimated that the sales will be completed in 2022. The sales volume is about 1 billion, the annual sales volume in 2023 is 2 billion, and the annual sales volume in 2024 is 3-3.5 billion. |
3 Years |
Health and Safety
Has the company set up a safety responsibility system, and distributed to all levels of supervisor and provided them with corresponding training?
YesDoes the company conduct regular inspection of the plant and equipment, to ensure the health and safety of the workshop at least in accordance with the law?
YesDoes the company regularly provide necessary safety and health training, to make the staff understand that there might be occupational hazards in their work, and take appropriate protective measures when necessary? (For example, how to use personal protective equipment safely, etc.)
YesDoes the company hold regular fire drills, including fire drills and evacuation drills? Do the staff clearly know how to raise an alarm, how to evacuate and how to use the fire extinguisher?
YesDoes the company have the approval report issued by the local Fire Bureau?
YesDoes the company provide sufficient first aid equipment? Are first-aid kits and trained first-aiders available in each workplace?
YesDoes the company provide clean lavatory, separating men’s and ladies?
YesDoes the company provide clean drinking water to the staff? Is there unrestricted access to the drinking water?
YesCorporate social responsibility
Is it clarified that there’s no child labor in the company?
YesDoes the company have an explicit job management program, and take corresponding measures to check the age of the employees?
YesAre the staff clearly aware of the terms of labour contract, regulations of the company and the right of free employment?
YesHave the staff been forced to work overtime? Will they be fined or fired if they refuse to?
No